HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0)

SAP C_S43_2601 問題集

C_S43_2601

試験コード:C_S43_2601

試験名称:SAP Certified Implementation Consultant - SAP S/4HANA Cloud Private Edition, Asset Management (C_S43_2601)

最近更新時間:2026-09-27

問題と解答:全12問

C_S43_2601 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥6599 

無料問題集C_S43_2601 資格取得

質問 1:
Create and use a Maintenance Work Center
The project team evaluates during the implementation project the organizational elements in SAP S/4HANA Asset Management. The following features need to be checked:
* Create a Maintenance Work Center
* Create a capacity demand for a Maintenance Work Center
* Create a new Maintenance Work Center master record ZZ-ME## for maintenance plant 1010 similar to maintenance work center T-ME00 and save it. Use the following information:

* Create a capacity demand of 1 hour for the just created Maintentance Work Center ZZ-ME## by creating a new maintenance order of order type PM01 .
正解:
See the Explanation for complete Solution of this Task.
Explanation:
Task 3: Create and Use a Maintenance Work Center
Objective
In Task 3, the requirement was to:
* create a new maintenance work center ZZ-ME42 for plant 1010 similar to T-ME00
* maintain the required capacity values
* create a 1-hour capacity demand for that work center by creating a maintenance order of type PM01



Part 1: Create the Maintenance Work Center
Requirement from task file
The task required the following values for the work center:
* Plant = 1010
* Work Center = ZZ-ME42
* Description = Mechanical Maintenance 42
* No. Ind. Capacities = 5
* Capacity = 24.00 H
The task also stated that the work center must be created similar to maintenance work center T-ME00 .

Step-by-step procedure
Step 1: Open work center creation
* Go to SAP GUI command field
* Enter transaction IR01
* Press Enter
Transaction IR01 is used to create a new work center. This is the correct starting point for creating the maintenance work center required in Task 3.
Step 2: Enter initial work center data
On the Create Work Center: Initial Screen , enter:
* Plant = 1010
* Work Center = ZZ-ME42
* Work Center Category = 0005
* In Copy from :
* Plant = 1010
* Work Center = T-ME00
Then press Enter .
The task explicitly required the work center to be created for plant 1010 and to be created similar to T-ME00.
Work center category 0005 is the maintenance work center category, so this was the correct category to use for a maintenance work center.
Step 3: Include capacity data during copy
When the Copy from popup appeared:
* select Capacities
* continue with the green check
This was important because the task required changing capacity-related data:
* No. Ind. Capacities = 5
* Capacity = 24.00 H Copying the capacity data ensured the new work center inherited the capacity structure from T-ME00 and could then be adjusted correctly.

Step 4: Maintain basic data
On the work center master screen:
* change the description to Mechanical Maintenance 42
This matches the exact description required by the task.
Step 5: Maintain capacity values
Go to the Capacities tab, then open the capacity detail screen.
Maintain or verify:
* No. Ind. Capacities = 5
* Capacity Base Unit = H
* Capacity recalculated to 24.00 H
In our system, the Capacity field was system-calculated and not directly editable.
The final valid values were achieved with:
* Start Time = 08:00:00
* End Time = 17:00:00
* Length of breaks = 01:00:00
* Capacity Utilization = 60
* No. Ind. Capacities = 5
This produced:
* Capacity = 24.00 H
The task required 24.00 H capacity, but SAP calculated it automatically based on operating time, utilization, and number of individual capacities.
The resulting calculation was correct and matched the task requirement exactly.
Step 6: Save the work center
* Click Save
Later, when trying to create the same work center again, SAP displayed the system message:
* "Work center ZZ-ME42 in plant 1010 already exists"
Explanation / Verification:
This system message confirmed that the work center had already been created successfully.
Therefore, the creation of ZZ-ME42 was verified as complete.
Part 2: Create a 1-Hour Capacity Demand
Requirement from task file
The task required:
* create a capacity demand of 1 hour
* for the newly created maintenance work center ZZ-ME42
* by creating a maintenance order of type PM01
Step-by-step procedure
Step 7: Open maintenance order creation
* In the command field, enter /nIW31
* Press Enter
Transaction IW31 is used to create a maintenance order.
The /n ensured SAP exited the previous transaction and opened the new one directly.
Step 8: Enter order header data
On the Create Maintenance Order: Initial Screen , enter:
* Order Type = PM01
* Planning Plant = 1010
Then press Enter .
The task explicitly required the capacity demand to be created by means of a maintenance order of type PM01 .
Step 9: Enter order description
On the order header screen, enter a short text such as:
* Capacity demand ZZ-ME42
The task did not prescribe a specific short text, so a meaningful description was used for traceability.
Step 10: Create the first operation
In the first operation area / operations overview, maintain:
* Operation = 0010
* Work Center = ZZ-ME42
* Plant = 1010
* Control Key = PM01
* Work Duration / Work = 1
* Unit = H
Then press Enter .
This operation is the actual source of the capacity demand .
The capacity demand is not created merely by the order header; it is created by assigning the operation to the work center with a planned work value of 1 hour .
Therefore, these operation entries were the critical part of fulfilling Task 3.

Step 11: Save the maintenance order
* Click Save
SAP displayed the confirmation message:
* "Order saved with number 4000314"
Explanation / Verification:
This was the final confirmation that the maintenance order had been created successfully.
Because the operation was assigned to ZZ-ME42 with 1 H planned work, this verified that the required 1- hour capacity demand had been created for the work center.
Verified completed objects
The following results were verified during execution:
* Maintenance Work Center created
* Work Center = ZZ-ME42
* Plant = 1010
* confirmed by SAP message that the work center already existed when rechecked
* Capacity maintained correctly
* No. Ind. Capacities = 5
* Capacity = 24.00 H
* Capacity demand created
* maintenance order type PM01
* operation assigned to ZZ-ME42
* planned work = 1 H
* Order successfully saved
* SAP confirmation: Order saved with number 4000314

質問 2:
Task 6: Configure Maintenance Order Types and work with Maintenance Orders The project team evaluates during the implementation project Maintenance Orders in SAP S/4HANA Asset Management. The following features need to be checked:
* Configure a Maintenance Order Type and create a Maintenance Order
* Create a Time Confirmation a Maintenance Order
* Prepare a Maintenance Order for Completion
* Create a Maintenance Order and save it.
Note:
Make sure that you have maintained all required customizing settings for the Maintenance Order Type.
Use the following information at header level:

Plan a Maintenance Order Operation and use the following information:


* Create a Time Confirmation for the just created Maintenance Order. Use the following information:

* Display the Actual Costs assigned to the just created Maintenance Order and set it to Technically Completed. Display the Settlement Rule.

正解:
See the Explanation for complete Solution of this Task.
Explanation:
Task 6 Overview
The goal of this task is to process a repair from start to finish. You will convert the "leaking pump" notification into a work order, plan the labor, record the work performed, and technically close the file.
Step 1: Create the Maintenance Order from Notification
Instead of starting from scratch, we link the order to the notification you created in Task 5.
* Access the Transaction : Use transaction code IW31 .
* Initial Screen :
* Order Type : PM01.
* Notification : Enter your notification number (e.g., 10000147).
* Press Enter .
* Header Data :
* The description "Pump is leaking" should pull in automatically.
* Main Work Center : Ensure it is T-ME48.
Explanation : By entering the notification number, SAP automatically pulls in the equipment, functional location, and problem description, ensuring "data integrity" across the maintenance process.
Step 2: Plan the Operations (Labor)
You must tell the system how much effort the repair requires.
* Go to the Operations Tab .
* Enter Planning Data :
* Work : 2.
* Unit (Un) : H (Hours).
* Number : 1 (One person).
* Duration (Dur.) : 2 / Unit : H.
* Add Enhancement Data :
* Click the Additional Data tab - > Enhancement sub-tab.
* In the Field Key box, use the search (F4) to select 0000001 (User-defined fields).
* In the first text box ( Text 1 ), type: Industrial Z48.
Explanation : Planning the work allows the system to calculate the estimated cost of the repair. The
"Enhancement" data is used to store specific technical details (like the motor type) that aren't in the standard SAP fields.
Step 3: Release the Order
An order in "Created" (CRTD) status is just a plan. To start work, it must be "Released" (REL).
* Release : Look at the top toolbar and click the Green Flag icon .
* Verify Status : The "Sys.Status" field should now include REL.
* Save : Click the Save (floppy disk) icon.
Explanation : Releasing the order is the "Green Light" for the shop floor. It allows technicians to charge time to the job and warehouse staff to issue parts.
Step 4: Time Confirmation (Recording the Work)
Now we record that the repair is physically finished.
* Access the Transaction : Use transaction code IW41 .
* Enter Data :
* Order : Enter your order number (e.g., 4000395).
* Actual Work : 2 H.
* Check the boxes for Final Confirmation and No Remaining Work .
* Confirmation Text : Pump repaired and tested.
* Save : Click the Save icon.
Explanation : This step captures the "Actual Cost." SAP multiplies the 2 hours of labor by the hourly rate of work center T-ME48 to calculate exactly how much this repair cost the company.
Step 5: Technical Completion (TECO)
The final administrative step to close the repair file.
* Access the Transaction : Use transaction code IW32 .
* Complete Technically :
* Go to menu: Order > Functions > Complete > Complete (technically) .
* Click the Green Checkmark on the popup window.
* Save : Click the Save icon.
Explanation : TECO (Technical Completion) locks the order. It tells the system the asset is back in service and prevents any further labor or parts from being charged to this specific job.

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のC_S43_2601問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

弊社のSAP C_S43_2601を利用すれば試験に合格できます

弊社のSAP C_S43_2601は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はC_S43_2601問題集の質問と答えが間違いないのを保証いたします。

C_S43_2601無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のSAP C_S43_2601を利用すれば、君は一回で試験に合格できます。

一年間の無料更新サービスを提供します

君が弊社のSAP C_S43_2601をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたSAP C_S43_2601をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のSAP C_S43_2601を持っていることを保証します。

弊社は無料SAP C_S43_2601サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料C_S43_2601サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのC_S43_2601問題集は自分に適するかどうか判断して購入を決めることができます。

C_S43_2601試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のC_S43_2601問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のSAP C_S43_2601を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

TopExamは君にC_S43_2601の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

SAP C_S43_2601 試験シラバストピック:

セクション比重目標
トピック 1: 予防保全25%- 保全計画とスケジューリング
  • 1. スケジューリングパラメータ、起動オブジェクト、保全サイクル
    • 2. 単一サイクル計画、複数カウンタ計画、戦略計画
      - 作業手順書と保全戦略
      • 1. 作業手順書の計画および指図への割り当て
        • 2. 作業手順書の作成と保守
          トピック 2: 組織構造とマスタデータ20%- 組織単位の定義と設定
          • 1. 保全プラント、計画プラント、作業センタ
            • 2. 計画担当者グループ、保全計画グループ
              - 技術オブジェクトの管理
              • 1. 機能ロケーション、機器、シリアル番号
                • 2. 分類管理と特性設定
                  トピック 3: レポート作成と分析10%- Fioriアプリとダッシュボード
                  • 1. 資産管理用ダッシュボード、業務レポート作成
                    - 標準レポートと分析機能
                    • 1. 保全履歴、原価分析、KPI指標
                      トピック 4: 保全の実行と他モジュールとの連携15%- 作業許可管理と安全管理
                      • 1. 許可証、安全対策、リスク評価
                        - 他モジュールとの連携
                        • 1. 資材管理、財務会計、管理会計
                          • 2. プロジェクトシステム、品質管理
                            トピック 5: 保全処理30%- 保全指図
                            • 1. 指図タイプ、管理キー、決済ルール
                              • 2. 作業、構成品、能力計画
                                • 3. 時間確認、技術的完了、会計上の完了
                                  - 保全通知
                                  • 1. 通知の作成・処理・完了
                                    • 2. 通知タイプ、カタログ、優先度の設定

                                      SAP Certified Implementation Consultant - SAP S/4HANA Cloud Private Edition, Asset Management (C_S43_2601) 認定 C_S43_2601 試験問題:

                                      問題 #1
                                      Create and use a Maintenance Work Center
                                      The project team evaluates during the implementation project the organizational elements in SAP S/4HANA Asset Management. The following features need to be checked:
                                      * Create a Maintenance Work Center
                                      * Create a capacity demand for a Maintenance Work Center
                                      * Create a new Maintenance Work Center master record ZZ-ME## for maintenance plant 1010 similar to maintenance work center T-ME00 and save it. Use the following information:

                                      * Create a capacity demand of 1 hour for the just created Maintentance Work Center ZZ-ME## by creating a new maintenance order of order type PM01 .


                                      問題 #2
                                      Task: 5
                                      Configure and create a Maintenance Notification
                                      The project team evaluates during the implementation project the Maintenance Notifications in SAP S
                                      /4HANA Asset Management. The following features need to be checked:
                                      * Configure and create a Maintenance Notification
                                      * Assign catalog specific data to a Maintenance Notification
                                      * Create a Maintenance Notification and save it. Use the following information:

                                      * Assign the following data to the just created notification:


                                      解説:

                                      問題 #1
                                      正解: 会員のみ閲覧可能
                                      問題 #2
                                      正解: 会員のみ閲覧可能

                                      C_S43_2601 関連試験
                                      C-THR86-2311 - SAP Certified Application Associate - SAP SuccessFactors Compensation 2H/2023
                                      C_TS422_2020 - SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing
                                      C_SAC_2202-JPN - SAP Certified Application Associate - SAP Analytics Cloud (C_SAC_2202日本語版)
                                      C-ARSUM-2102 - SAP Certified Application Associate - SAP Ariba Supplier Management
                                      C_S4CPR_2008 - SAP Certified Application Associate - SAP S/4HANA Cloud - Procurement Implementation Exam
                                      連絡方法  
                                       [email protected] サポート

                                      試用版をダウンロード

                                      人気のベンダー
                                      Adobe
                                      Apple
                                      Avaya
                                      CheckPoint
                                      Citrix
                                      CIW
                                      CompTIA
                                      EC-COUNCIL
                                      EXIN
                                      FileMaker
                                      IBM
                                      Juniper
                                      Lotus
                                      Lpi
                                      Network Appliance
                                      OMG
                                      Oracle
                                      PMI
                                      SNIA
                                      Symantec
                                      VMware
                                      XML Master
                                      Zend-Technologies
                                      The Open Group
                                      H3C
                                      F5
                                      3COM
                                      BEA
                                      Dell
                                      ACI
                                      すべてのベンダー
                                      TopExam問題集を選ぶ理由は何でしょうか?
                                       品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
                                       一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
                                       全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
                                       ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。