質問 1:Which one of the following metrics is primarily used to measure the achievement of a test objective and reported in a test completion report?
A. Actual versus planned estimation (in hours) for testing activities
B. Number of automated test cases versus planned automated test cases
C. Accumulated number of resolved defects versus accumulated number of defects
D. Code coverage
正解:B
解説: (Topexam メンバーにのみ表示されます)
質問 2:Assume that you are using traceability to manage test case coverage against test conditions. During test analysis, three test conditions were identified. Test design for system testing has been completed and 10 test cases (TC1 to TC10) have been designed, as described by the following traceability matrix ("C" indicates a critical test case, while "NC" indicates a non-critical test case):

[traceability matrix not visible in the prompt]
The exit criterion for system testing states that each test condition must have all the associated critical test cases successfully executed (passed) AND all associated non-critical test cases at least executed.
The following is the situation after three days of system testing:
TC1, TC2, TC4, TC5, TC7, TC9: passed
TC3, TC10: failed (with an associated open defect report)
TC6, TC8: not run
Management wants to decide whether to release the system. You advise them that the system does not yet meet the defined exit criteria.
Based only on the given information, which test condition does not yet meet the stated exit criterion?
A. Test condition 3
B. Test condition 2
C. None, all meet the stated exit criteria
D. Test condition 1
正解:B
解説: (Topexam メンバーにのみ表示されます)
質問 3:Which of the following is not true regarding applying a model-based approach, e.g., TMMi, for improvements at project level?
A. The assessment should include test management processes such as test planning and test monitoring and control
B. Practices at organisational level should be tailored appropriate to the project's context
C. The assessment should include areas such as test policy and test organisation
D. The assessment should include test engineering processes such as test design, test implementation and test execution
正解:C
解説: (Topexam メンバーにのみ表示されます)
質問 4:A company that sells an established capture-replay execution tool is adding a test management tool. Same team, same technology, incremental development (V-model per increment), known first-year features; later features driven by customer demand.
Which two of the following factors are most likely to influence the estimation technique that would be selected in this scenario?
A. Expert availability
B. Time constraints
C. Knowledge in modelling
D. Estimation error
E. Data availability
正解:A,E
解説: (Topexam メンバーにのみ表示されます)
質問 5:Your company is considering purchasing a test tool suite from a respectable vendor. Your manager has searched the internet for comparable products, but none of them meet his specific requirements. A tool demonstration has been arranged for next week and your team has been invited to attend. The tool suite consists of a test management tool, test execution tool, and a requirements management tool. There is a possibility of adding a performance testing tool at a later stage.
You have decided to attend the demo but raise some issues beforehand regarding expectations.
Which two issues from the options provided below should at least be raised?
A. Which project will be selected to perform the tool pilot?
B. How will the implementation be organised?
C. Do we have a set of tool requirements to validate the tool against?
D. What are the problems we are trying to address?
E. Is customized training available?
正解:C,D
解説: (Topexam メンバーにのみ表示されます)
質問 6:Three exit criteria have been defined for a project:
A. Number of defects per test case is less than 0.5 The first week of the testing has shown the following results (Mon-Fri):Defects Found = 21 (3+4+2+5+7)Defects Fixed = 8 (0+2+2+3+1)Tests Run = 43 (10+3+20+5+5)Tests Passed = 24 (5+3+15+0+1)
B. Number of outstanding defects is less than 5
C. Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK
D. Test cases passed is more than 70%
E. Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK
F. Criteria A = OK, criteria B = OK, criteria C = OK
G. Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK
正解:B
解説: (Topexam メンバーにのみ表示されます)
弊社のBCS TM3を利用すれば試験に合格できます
弊社のBCS TM3は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はTM3問題集の質問と答えが間違いないのを保証いたします。

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のBCS TM3を利用すれば、君は一回で試験に合格できます。
BCS TM3 認定試験の出題範囲:
| トピック | 出題範囲 |
|---|
| トピック 1 | - Managing the Test Activities: This section focuses on the role of Test Managers and how testing is planned, monitored, controlled, and completed across different software development contexts. It covers the overall test process, including defining test plans, tracking progress, and ensuring proper closure. Candidates are expected to understand how testing fits within various lifecycle models, test levels, and types, while engaging stakeholders effectively. The syllabus emphasizes risk-based testing to identify quality risks, assess impacts, and select suitable mitigation activities. It also highlights formulating project-level test strategies, selecting appropriate test approaches, setting measurable objectives, and improving processes through models like IDEAL. Additionally, candidates should be able to evaluate and introduce test tools based on business needs, risks, and return on investment.
|
| トピック 2 | - Managing the Product: This section emphasizes understanding and managing the product under test, focusing on controlling and assessing testing activities. It covers test metrics, reporting, and defect management across sequential, Agile, and hybrid environments. Candidates should be able to select and apply appropriate test estimation techniques and establish defect workflows suited to the project context. The syllabus also includes preparing business cases for testing activities that justify costs, benefits, and the value of testing within the overall project.
|
| トピック 3 | - Managing the Team: This section addresses the role of Test Leads in analyzing team needs, identifying required skills, and coordinating efforts using a whole-team approach. Candidates are expected to understand how to align team capabilities with project goals and ensure effective collaboration. The syllabus highlights techniques for team management, resource allocation, and fostering continuous improvement through retrospectives and knowledge sharing to optimize testing performance.
|
参照:https://www.bcs.org/qualifications-and-certifications/certifications-for-professionals/software-testing-certifications/istqb-certified-tester-advanced-level-test-management/
弊社は失敗したら全額で返金することを承諾します
我々は弊社のTM3問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のBCS TM3を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のTM3問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
TopExamは君にTM3の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
一年間の無料更新サービスを提供します
君が弊社のBCS TM3をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたBCS TM3をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のBCS TM3を持っていることを保証します。
弊社は無料BCS TM3サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料TM3サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのTM3問題集は自分に適するかどうか判断して購入を決めることができます。
TM3試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。