質問 1:When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling?(Choose three)
A. General values from work scheduling view of the material master
B. Standard values in the operations of routings
C. General operation values of routings
D. User-defined fields in the operation of routings
E. General item values of bill of materials
正解:B,C,D
質問 2:In which scenario will the error message shown in the attached screenshot occur? Exhibit:
A. The selection method is set to "selection only by production version" in the material master.
B. The routing is not valid at the explosion date.
C. A valid routing exists, but the Customizing for the order type is set to manual routing selection.
D. A valid routing exists, but the material master is set to manual routing selection.
正解:B
質問 3:Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned
orders?(Choose three)
A. A planning algorithm from capacity planning
B. Automatic selection of the production version by applying quota arrangement records in material requirements planning (MRP)
C. Automatic selection of the production line assigned to the MRP group used during material requirements planning (MRP)
D. Automatic selection of the production version in material requirements planning (MRP) using the selection methods setting
E. Manual assignment of planned production quantities in a planning table
正解:B,D,E
質問 4:You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
A. Demand management -> Sales and operations planning -> Capacity planning -> Long-term planning -> Material requirements planning
B. Material requirements planning -> Demand management -> Sales and operations planning -> Long-term planning -> Capacity planning
C. Sales and operations planning -> Demand management -> Long-term planning -> Material requirements planning -> Capacity planning
D. Long-term planning -> Sales and operations planning -> Demand management -> Material requirements planning -> Capacity planning
正解:C
質問 5:You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change therequirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case?(Choose two)
A. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.
B. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
C. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
D. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
正解:A,B
質問 6:What features related to process orders can be used to fulfill Good Manufacturing Practices (GMP) requirements?(Choose three)
A. Availability check
B. Electronic batch record
C. Resource selection
D. Approved master recipes
E. Digital signature
正解:B,D,E
質問 7:What do you have to consider regarding consumption?(Choose two)
A. Consumption takes place on the material level between the planned independent requirements and the planned orders.
B. Consumption is restructured with the planning run.
C. Consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.
D. Consumption can take place between order reservations and planned independent requirements, depending on the strategy.
正解:C,D
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のC_TSCM42_66問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
弊社は失敗したら全額で返金することを承諾します
我々は弊社のC_TSCM42_66問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のSAP C_TSCM42_66を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
弊社のSAP C_TSCM42_66を利用すれば試験に合格できます
弊社のSAP C_TSCM42_66は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はC_TSCM42_66問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のSAP C_TSCM42_66を利用すれば、君は一回で試験に合格できます。
SAP C_TSCM42_66 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Production Orders Advanced (PP-SFC)
|
トピック 2 | |
トピック 3 | - Lean Manufacturing (PP-REM PP-KAB)
|
トピック 4 | - Material and Capacity Req. Planning
|
トピック 5 | |
トピック 6 | - Material Requirements Planning (PP-MRP)
|
トピック 7 | - Application Overview and Background
|
参照:https://training.sap.com/shop/certification/c_tscm42_66-sap-certified-application-associate---production---planning--manufacturing-with-sap-erp-60-ehp6-g/
TopExamは君にC_TSCM42_66の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
弊社は無料SAP C_TSCM42_66サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料C_TSCM42_66サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのC_TSCM42_66問題集は自分に適するかどうか判断して購入を決めることができます。
C_TSCM42_66試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
一年間の無料更新サービスを提供します
君が弊社のSAP C_TSCM42_66をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたSAP C_TSCM42_66をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のSAP C_TSCM42_66を持っていることを保証します。