HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

NCARB Project-Management 問題集

Project-Management

試験コード:Project-Management

試験名称:ARE 5.0 Project Management (PjM) Exam

最近更新時間:2025-10-01

問題と解答:全78問

Project-Management 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥6599 

無料問題集Project-Management 資格取得

質問 1:

Refer to the exhibit
Twenty-five acres of undeveloped rural property was purchased for the site of a new elementary school.
During the DD phase, the civil engineer and structural engineers make design proposals based on the information provided in the geotechnical report. The civil engineer indicates that several cubic yards of fill material should be installed within the proposed building footprint to make up for the change in topography (was uniformly). The structural engineer indicates a footing depth of 24 inches for the entire facility. During the CD phase, the owner asks the architect to add classrooms to one wing. The civil engineer proposes that extra fill should not be installed beneath the additional classrooms.
Which of the following should the architect do before completion of CDs? Check the three that apply.
A. Add general notes about structural bearing to the drawings
B. Schedule a quality assurance meeting with the project team
C. Update the estimate of the cost of work
D. Increase the footing depth beneath the new classrooms
E. Request an updated geotechnical evaluation
F. Notify the structural engineer of the civil engineer's recommendation
正解:C,E,F
解説: (Topexam メンバーにのみ表示されます)

質問 2:
A new site has been identified for a prototype fast food restaurant. The geotechnical report indicates fill materials were found in the subsurface conditions along the east side of the proposed building location.
What member of the project team should be involved in modifications to the prototype building design to address this issue?
A. Excavation Contractor
B. Environmental Engineer
C. Structural Engineer
D. Landscape Architect
正解:C
解説: (Topexam メンバーにのみ表示されます)

質問 3:
During the preparation of the construction documents, it was noted that the survey inaccurately located the property line. Consequently, the parking layout had to be redesigned to fit within the corrected property boundary.
The architect's additional costs and associated delay are the responsibility of which one of the following parties?
A. Architect
B. Owner
C. Surveyor
D. Civil Engineer
正解:B
解説: (Topexam メンバーにのみ表示されます)

質問 4:
The architect's estimate of the cost of the work at the end of the construction documents phase exceeds the owner's stated budget for the cost of the work.
According to AIA Document B101, what should the architect recommend to the owner?
A. Revise project scope, without additional compensation
B. Change the quality of materials, with additional compensation
C. Alter the project delivery method, without additional compensation
D. Make reductions in the project program, with additional compensation
正解:A
解説: (Topexam メンバーにのみ表示されます)

質問 5:
A geotechnical report for a public project reveals a previously unknown condition and indicates that there is rock directly beneath the existing grade. The proposed building will now require a shallow foundation. The chosen location was the result of a three-year process evaluating multiple potential sites.
Which actions should the architect take next as a result of the geotechnical report results? Check the three that apply.
A. Evaluate alternate project sites for the proposed building.
B. Determine what type of rock is beneath the existing grade.
C. Consult with an excavation company for rock removal.
D. Update the current project schedule.
E. Update the detailed cost estimate.
F. Request an additional services agreement for the unknown condition.
正解:B,D,E
解説: (Topexam メンバーにのみ表示されます)

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のProject-Management問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

弊社のNCARB Project-Managementを利用すれば試験に合格できます

弊社のNCARB Project-Managementは専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はProject-Management問題集の質問と答えが間違いないのを保証いたします。

Project-Management無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のNCARB Project-Managementを利用すれば、君は一回で試験に合格できます。

NCARB Project-Management 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Project Quality Control: This section of the exam measures skills of project managers and covers procedures for ensuring quality and maintaining the Standard of Care throughout the project. It focuses on applying regulatory requirements, reviewing documentation for quality, reducing risks and liabilities, and managing the design process to preserve its objectives
トピック 2
  • Contracts: This section of the exam measures the skills of project managers and covers the analysis of contracts that govern the relationships between architects, owners, contractors, and consultants. It highlights verifying adherence to agreements, interpreting key contractual elements, and ensuring consultant work is properly integrated into the project.
トピック 3
  • Project Execution: This section of the exam measures skills of architectural associates and covers the management of project execution through administrative procedures rather than design decisions. It addresses evaluating budgets, managing scope changes, preparing project documentation in line with delivery methods, and securing necessary approvals from relevant authorities.
トピック 4
  • Project Work Planning: This section of the exam measures the skills of architectural associates and covers the development and communication of an effective project work plan. It emphasizes maintaining schedules, setting clear criteria for work planning, and ensuring consistent communication with stakeholders, including owners, contractors, consultants, and internal staff.
トピック 5
  • Resource Management: This section of the exam measures the skills of project managers and covers how to determine the right team composition and manage time allocation for successful project delivery. It focuses on evaluating criteria for assembling teams and ensuring resources are properly managed to execute the project within agreed terms.

参照:https://www.ncarb.org/pass-the-are/prepare/project-management

一年間の無料更新サービスを提供します

君が弊社のNCARB Project-Managementをご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたNCARB Project-Managementをお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のNCARB Project-Managementを持っていることを保証します。

弊社は無料NCARB Project-Managementサンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料Project-Managementサンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのProject-Management問題集は自分に適するかどうか判断して購入を決めることができます。

Project-Management試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のProject-Management問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のNCARB Project-Managementを利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

TopExamは君にProject-Managementの問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

Project-Management 関連試験
PDD - ARE 5.0 Project Development and Documentation Exam
Project-Planning-Design - ARE 5.0 Project Planning & Design (PPD)
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。