無料問題集1z0-1066-23 資格取得
質問 1:
As the planner, you have made some changes to a few of the specifications for items in your simulation sets. You would like to run one of your existing Demand and Supply Plans that contains this simulation set to see how these changes impact the plan.
Which option shows the steps you must complete in order to ensure that when you run your existing Demand and Supply plan, it contains your changes to the simulation set?
A. No additional steps are necessary. Any plans that contain your simulation set will automatically be updated with the changes.
B. When the Demand and Supply Plan is run, verify that 'Recalculate Safety Stock' is selected in the Details section.
C. You are only able to update one item attribute at a time. Since you have changed multiple attributes, you will be unable to update and run this plan.
D. When the Demand and Supply Plan is run, verify that 'Refresh with current data' is selected in the Details section.
正解:D
質問 2:
During a client implementation, it is determined that an external forecast will need to be imported into Planning Central for use as a Demand Schedule in a Supply Plan.
What three steps must be executed to enable the successful load of the External Forecast file? (Choose three.)
A. Load Interface File for Import Process must be run.
B. Collect Planning Data Process must be run from Planning.
C. Collect Legacy Data Process must be run from Planning.
D. Flat File must be zipped.
E. CSV file must be generated.
正解:A,C,E
質問 3:
Which is NOT a legitimate way to launch a plan?
A. When editing plan options, click Save and Run.
B. From Manage Plans, select a plan in the search results, and select Run Plan from the Actions menu.
C. Launch via a scheduled process.
D. From Setup & Maintenance, in the Planning functional area, select a plan and click the Run icon.
正解:D
質問 4:
Your client wants to exclude all of the inventory from the 'Reject' subinventory from only one of their supply plans. What action must be taken to meet this requirement?
A. It is not possible to exclude one subinventory from a particular supply plan.
B. Manage Subinventories > Search and select subinventory > Deselect 'Nettable'
C. Manage Plans > Search and select supply plans > 'Organizations and Schedules' tab > 'Supply Schedules' > 'Subinventory Netting' > Deselect 'Reject' subinventory for each organization
D. Manage Subinventories > Choose a material status in which 'Nettable' is unchecked
E. Manage Plans > Search and select supply plans > 'Organizations and Schedules' tab > 'Organizations' > 'Subinventory Netting' > Deselect 'Reject' subinventory for each organization
正解:E
質問 5:
Your customer wants to display a numeric measure in both pound and kilogram Units of Measure (UOM) on a table. Describe the configuration steps to display a measure in two UOMs.
A. Open a table and select Actions, View Table Configuration and click Measure tab. Find the measure, duplicate the measure, and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.
B. Open a table and select Actions, View Table Configuration and click UOM tab. Select primary UOM as pound and secondary UOM as kilogram.
C. Open a table and select View, Format Measures to find the measure. Duplicate the measure and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.
D. Open a table and select View, Format Measures to find the measure. Now select pound as primary UOM and kilogram as secondary UOM.
正解:D
質問 6:
When duplicating a supply plan, which parameters can you modify if Copy Type is "copy plan options only"?
A. Name, Description. Access. Owner. Include Archive, and Notes
B. Name, Access. Owner, and Notes
C. Name, Description. Access. Supply Planning Mode, and Owner
D. Name, Description. Access (but if the original plan was private, you can't edit the Users list), and Notes
正解:B
質問 7:
What happens when a demand planner approves a demand plan and then adjusts shipment history and runs demand plan again?
A. The approve action takes the data from the two final forecast measures and copies to Approved Final Shipments Forecast and Approved Final Bookings Forecast, respectively. Any subsequent demand plan run can change final shipments or bookings forecast values that will automatically update the approved forecast measures.
B. The approve action makes the Adjusted Shipments Forecast and Adjusted Bookings Forecast measures "not editable." But any subsequent demand plan run can change Final Shipments Forecast and Final Bookings Forecast values.
C. The approve action makes the Adjusted Shipments Forecast and Adjusted Bookings Forecast measures "not editable." After a forecast is approved, the Final Shipments Forecast and Final Bookings Forecast measures remain unchanged until the forecast is approved again.
D. The approve action takes the data from the two final forecast measures and copies to Approved Final Shipments Forecast and Approved Final Bookings Forecast, respectively. After a forecast is approved, the approved values remain unchanged until the forecast is approved again.
正解:D
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社の1z0-1066-23問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
TopExamは君に1z0-1066-23の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
弊社のOracle 1z0-1066-23を利用すれば試験に合格できます
弊社のOracle 1z0-1066-23は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社は1z0-1066-23問題集の質問と答えが間違いないのを保証いたします。

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のOracle 1z0-1066-23を利用すれば、君は一回で試験に合格できます。
弊社は無料Oracle 1z0-1066-23サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料1z0-1066-23サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこの1z0-1066-23問題集は自分に適するかどうか判断して購入を決めることができます。
1z0-1066-23試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
一年間の無料更新サービスを提供します
君が弊社のOracle 1z0-1066-23をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたOracle 1z0-1066-23をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のOracle 1z0-1066-23を持っていることを保証します。
Oracle 1z0-1066-23 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Managing Sourcing and Approved Suppliers
- Modelling and Analyzing the Supply Plan
|
トピック 2 | - Supply Planning Collaboration
- Sales and Operations Planning
- Configure Safety Stock Plan options
|
トピック 3 | - Configure Planning Analytics
- Configure Replenishment Planning
- Costing and Inventory Foundations
|
トピック 4 | - Evaluate and Execute Simulations
- Contract Management Collaboration
- Inventory rebalancing via clustering
|
トピック 5 | - Configure Production Scheduling
- Describe Override Demand Forecast and Plan Approval
|
参照:https://education.oracle.com/oracle-planning-and-collaboration-cloud-2022-implementation-professional/pexam_1Z0-1066-23
弊社は失敗したら全額で返金することを承諾します
我々は弊社の1z0-1066-23問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のOracle 1z0-1066-23を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。