質問 1:A new application is being deployed to production. The application has separate libraries for physical files, logical files, journals, journal receivers, and other journaled objects.
After saving the journal receiver libraries, which sequence should be used to save the other libraries, so that the restore will correctly re-establish the journaling environment and file relationships, without using the DFRID (name) parameter of the RSTLIB command and the RSTDFROBJ command?
A. Journals Logical files Other journaled objects Physical files
B. Logical files Physical files Journals Other journaled objects
C. Journals Physical files Logical files Other journaled objects
D. Physical files Logical files Other journaled objects Journals
正解:C
質問 2:An administrator is recovering a single image system after a crash. The administrator has placed the latest SAVSYS into the external SAS TS2900 LTO tape drive and performed a D-Mode IPL.
Why is the system failing to find the SAVSYS media?
A. The l_BASE_01 DVD must be loaded up to SST before a SAS tape device is recognized.
B. The TS2900 is an alternate installation device and requires an l_BASE_01 DVD in the alternate IPL device.
C. The TS2900 is an alternate IPL device but not an alternate installation device.
D. The TS2900 requires Alternate IPL Enablement feature to boot the SAVSYS.
正解:C
質問 3:At the end of an *ALLUSR library save the system issues the following message:
"CPF3777631 libraries saved, 1 partially saved, 0 not saved."
The library QPFRDATA missed saving the 'MGTCOL objects.
Taking which action will avoid the problem in the future?
A. As part of the save operation cycle the collection services job to get an empty "MGTCOL object so the save will not fail on it.
B. Uncheck the 'Create Database Files during collection" option on the Collection Services Properties in IBM i Navigator.
C. Change the Save While Active parameter on the save to "SYSDFN to allow a check point on the management collection objects.
D. Stop performance collection as part of the backup routine, and restart it when the backup is complete.
正解:B
質問 4:A subsystem description is configured as shown in the following screens;
Users are assigned to each job queue to run their batch work. The users assigned to the ACCOUNTING job queue are complaining that their batch jobs are occasionally not running. Other users do not experience this issue.
Why are ACCOUNTING users experiencing this problem?
A. The auxiliary storage pool group is not set to match the number of job queue entries in the subsystem.
B. The subsystem starts jobs up to the maximum allowed for each job queue starting with the lowest sequence number (SEQ NBR column)
C. The run priority of the job does not match the sequence number of the job queue entry.
D. The jobs in the ACCOUNTING queue are run at the lowest execution pnonty based on the sequence number field Jobs from CORP and ENGR are consuming all the processing capability allowed for the subsystem.
正解:C
質問 5:During a system reload, theRSTDLOcommand is mistakenly canceled.When the restore is reattempted,message CPF9032 "Document interchange session not started" is returned.
Which step{s) will resume the restore?
A. Run the RCLDLO command Run the RSTDLO command D Run the DSPJOBLOG command and note the position value of the last item restored Run the RSTDLO RSTFLR CALL) command with the POSITION parameter set to the value listed for the last item restored
B. Run the RCLSTG command Run the RSTDLO RSTFLR ('NEW) command
C. Run the command RSTDLO RSTFLR (*NEW)
正解:A
質問 6:A file PF1 exists in library XYZLIB,and FILE2 exists in IFS directory ABCDIR.
What are the minimum set of authorities to grant a user read-only access to XYZLIB/PF1
and /ABCDIR/FILE2?
A. 1)*USEforXYZUBandPF1 2) *X for ABCDIR and *R for FILE2
B. 1) *CHANGE for XYZLIB and PF1 2) *RX for ABCDIR and *R for FILE2
C. 1) *USE for XYZLIB: *CHANGE for PF1 2) *RX for ABCDIR and *RX for FILE2
D. 1)*XforXYZUB,*RforPF1 2) *USE for ABCDIR and FILE2
正解:D
質問 7:An administrator has noticed that the number of security audit journal receivers on the system is getting unmanageable.
How can the administrator adjust the journal to still capture and retain the required journal entries but generate fewer receivers?
A. Change the current journal receiver to a higher threshold value.
B. Create a new security journal specifying the number of receivers to use.
C. Change the security journal to delete journal receivers.
D. Create a new journal receiver setting the threshold to a higher value.
正解:A
弊社は無料IBM C9010-030サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料C9010-030サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのC9010-030問題集は自分に適するかどうか判断して購入を決めることができます。
C9010-030試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
TopExamは君にC9010-030の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
一年間の無料更新サービスを提供します
君が弊社のIBM C9010-030をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたIBM C9010-030をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のIBM C9010-030を持っていることを保証します。
IBM C9010-030 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | |
トピック 2 | |
トピック 3 | - Explain critical factors when planning an upgrade to IBM i 7.2 (from IBM i 6.1 or IBM i 7.1)| including using various planning resources such as Memo to Users| and Pre-Upgrade Verific
|
トピック 4 | - Operating System Upgrades
|
参照:https://www-03.ibm.com/certify/exam.html?id=C9010-030
弊社は失敗したら全額で返金することを承諾します
我々は弊社のC9010-030問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のIBM C9010-030を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
弊社のIBM C9010-030を利用すれば試験に合格できます
弊社のIBM C9010-030は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はC9010-030問題集の質問と答えが間違いないのを保証いたします。
この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のIBM C9010-030を利用すれば、君は一回で試験に合格できます。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のC9010-030問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。