HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

ISQI CTFL-AT 問題集

CTFL-AT

試験コード:CTFL-AT

試験名称:ISTQB Certified Tester - Foundation Level Extension - Agile Tester

最近更新時間:2024-05-20

問題と解答:全40問

CTFL-AT 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥6599 

無料問題集CTFL-AT 資格取得

質問 1:
Which of the following is NOT a typical task performed by the tester within an Agile team?
A. Suggesting improvements in team retrospectives.
B. Ensuring the appropriate testing tasks are scheduled during iteration planning.
C. Ensuring all project status meetings are held according to the plan.
D. Working with business stakeholders to clarify requirements.
正解:C
解説: (Topexam メンバーにのみ表示されます)

質問 2:
Why is regression of software a high risk in agile projects?
A. Test automation can cause regression of software in the test environment.
B. Test-driven development means that existing functionality is not considered.
C. There is code churn due to change in business needs over several sprints.
D. Regression is built into software as a safeguard against unexpected failures.
正解:C
解説: (Topexam メンバーにのみ表示されます)

質問 3:
Which of the following sentences related to Risk-based testing is CORRECT?
A. Risk-based testing does not fit in Agile development processes, as each iteration focuses on limited parts of the product.
B. Risk-based testing fits well in Agile development processes, as risks are analyzed twice - during release and iteration planning.
C. Risk-based testing does not fit well in Agile development processes, as short iterations mandate short test times.
D. Risk-based testing fits well in Agile development processes, as risks are easy to identify when the work is divided into user stories.
正解:D
解説: (Topexam メンバーにのみ表示されます)

質問 4:
Which of the following activities are done in release planning?
1) Identifying testable user stories with acceptance criteria.
2) Elaborating the user stories into tasks.
3) Prioritizing the user stories.
4) Creating acceptance tests for the user stories.
5) Analyzing risks for each of the user stories.
6) Performing high level estimation for the release.
A. Activities 2 and 4
B. Activities 2, 3 and 5
C. Activities 1, 4 and 6
D. Activities 1, 3 and 6
正解:D
解説: (Topexam メンバーにのみ表示されます)

TopExamは君にCTFL-ATの問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のCTFL-AT問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のCTFL-AT問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のISQI CTFL-ATを利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

弊社のISQI CTFL-ATを利用すれば試験に合格できます

弊社のISQI CTFL-ATは専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はCTFL-AT問題集の質問と答えが間違いないのを保証いたします。

CTFL-AT無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のISQI CTFL-ATを利用すれば、君は一回で試験に合格できます。

一年間の無料更新サービスを提供します

君が弊社のISQI CTFL-ATをご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたISQI CTFL-ATをお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のISQI CTFL-ATを持っていることを保証します。

弊社は無料ISQI CTFL-ATサンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料CTFL-ATサンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのCTFL-AT問題集は自分に適するかどうか判断して購入を決めることができます。

CTFL-AT試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

ISQI ISTQB Certified Tester - Foundation Level Extension - Agile Tester 認定 CTFL-AT 試験問題:

1. Which of the following is the BEST way for a test team to keep its independence when working in an Agile development environment?

A) Locate the team that develops the test automation framework in a different location to the Agile development team.
B) Share the Test Strategy with the Agile development team, but not the details of the Test Cases.
C) Assign testers to be members of the Agile team, but ensure the testers report to a different manager than the developers.
D) Co-locate only some of the testers with the Agile development team, while the rest of the testers are in a different location.


2. What is the definition of agile software development?

A) Testing carried out informally where no formal test preparation or execution takes place, no recognized test design technique is used and there are no expectations for results.
B) A framework to describe the software development lifecycle activities from requirements specification to maintenance where test planning of the various test levels is done as soon as the test basis is ready
C) A group of software development methodologies based on iterative incremental development with self-organizing cross-functional teams who cooperate to define requirements and to implement the solution.
D) A way of developing software where the test cases are developed, and often automated, before the software under test is developed.


3. Which of the following statements would you expect to be the MOST direct advantage of the whole-team approach?

A) Capitalizing on the combined skills of business representatives, testers and developers working together to contribute to project success.
B) Having at least once a day an automated build and test process that detects integration errors early and quickly.
C) Reducing the involvement of business representatives because of the increased communication and collaboration between testers and developers.
D) Avoiding requirements misunderstandings which may not have been detected until later in the development cycle when they are more expensive to fix.


4. You are working in a software development company which, for many years, used a sequential development model and was organized into separate departments for each functional group (e.g. business analysts, developers, testers) located within their own office space. Your organization has recently changed to a SCRUM agile framework. Which of the following is an important organizational and behavioral best practice for a tester in the SCRUM team that should have also been practiced when using the sequential model?

A) Cross-functional teamwork means that all team members contribute to testing in various ways. For example, involving people with the test strategy, test planning and execution as well as test reporting.
B) Credibility means that the tester must share information with the stakeholders about the test process so that they find the selected test strategy and testing activities trustworthy.
C) Co-located teamwork means that all team members, including developers and testers, must sit together in the same office, so they can quickly communicate face-to-face.
D) Resilient testing means that the testing process is capable of dealing with rapid changes throughout the development process with test plans being updated during each iteration.


質問と回答:

質問 # 1
正解: C
質問 # 2
正解: C
質問 # 3
正解: A
質問 # 4
正解: A

連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。