質問 1:
During a site survey, which of the following is essential to verify at each potential tower
(select TWO)?
A. Power availability
B. Fence height
C. Grounding rod placement more than 12 deep
D. Tower access
E. Parking stops
正解:A,D

質問 2:
Without High Priority set, what is the maximum number of subscribers per PMP Access
Point?
A. 300
B. 200
C. 400
D. 100
正解:B

質問 3:
Scenario

The following question relates to the "Installation' TAB from the Project Description
Template and the information provided by the client (Project Description, Project Details, and Lyymo Map). This is a scenario based question. Please click on the scenario button at the bottom before answering the question.
Rows 3 through 7 of the Project Description Template are related to the installation infrastructure. Based on the information provided, which of the following best represents what should be entered into this section?


A. Option A
B. Option C
C. Option D
D. Option B
正解:A

質問 4:
Scenario

The following question relates to the "Installation' TAB from the Project Description
Template and the information provided by the client (Project Description, Project Details, and Lyymo Map). This is a scenario based question. Please click on the scenario button at the bottom before answering the question.
Rows 16 and 17 of the Project Description Template are related to the network management location. What is the network management location?


A. City Hall located at 544 Jefferson Street
B. City Courthouse located at 100 State Street
C. Lynx headquarters located at 2255 West Main Street
D. The City Water Tower
E. Any one of the Kiosk along the route
F. Lynx facility located at 455 North Garland Avenue
正解:F

質問 5:
Oceanside Information
The community of Oceanside is interested in obtaining a broadband access solution to all of the homes in the neighborhood. There is no fiber access in the neighborhood; however there is fiber near the entrance to the neighborhood on Highway A1A. The neighborhood association has requested that the proposal not have any tear-up of the existing roads.
The anticipated service area is approximately 1/2 x 1/3 miles.
Click on the Exhibit button to access the "Oceanside Map" and the "RFP Requirements"



The customer requirement calls for an over subscription rate of 20%, this supports which of the following statements?
A. Requires the use of 5.7/5.8 GHz for the links
B. Requires the designer to plan capacity at a higher throughput for the system
C. Allows the designer to plan capacity at a lower required throughput for the system
D. Allows the use of bi-polar antennas
正解:C

質問 6:
Signal attenuation can be the fading of signal strength along the propagation path. Which of the following would be considered causes of this (select THREE)?
A. Dispersion due to multipathing
B. Multi-path Fading
C. Obstructions in the Fresnel Zone
D. Solar flare activity
E. Power loss at the facility
F. Antenna Gain
正解:A,B,C

質問 7:
A customer has a growing backhaul network using unlicensed OFDM radio links.
Increasing RF congestion in the area is causing problems with some of the links. What long-term strategy can be used to allow continued growth and reliability for the customer?
A. Replace problem OFDM links with unlicensed FSK links and use unlicensed FSK links for all new deployments
B. Replace problem links with licensed links and use licensed links for all new deployments
C. Add 2+0 configuration to existing links and any new deployed backhauls
D. Replace antennas on problem links with narrow beam-width antennas and use narrow beam-width antennas on all future links
正解:B

質問 8:
Which of the following products would you discard when considering a link in NLoS (non line of sight) conditions (select TWO)?
A. FTP800
B. FTP300
C. PTP600
D. FTP500
E. FTP100
F. FTP200
正解:A,E

質問 9:
A new deployment area is planned with three 5.4 GHz sites. Each site will have a full cluster of six APs. Each AP is expected to average 5 Mbps downlink and 2 Mbps uplink loads. Three backhaul links are planned in a chain configuration (Network Operations
Center (NOC) to Site A, Site A to Site B, Site B to Site C). What is the minimum aggregate throughput required for the link from the NOC to Site A?
A. 84 Mbps
B. 126 Mpbs
C. 90 Mpbs
D. 42 Mbps
E. 30 Mbps
正解:B

MSC-111 関連試験
MSC-241 - Design and Deploy for MOTOTRBO Solutions EMEA
MSC-112 - Deploy Point (PTP and PMP) Solutions
MSC-321 - Designing and Deploying Advanced Data Capture (ADC) Solution
MSC-235 - Design and Deploy for MOTOTRBO Connect Plus Solutions BETA
連絡方法  
 support@topexam.jp サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。
a