質問 1:Near Line of Sight (nLoS) and Non Line of Sight (NLoS) conditions are present for a Point to Point microwave system when trees, buildings and other objects are in the direct path.
These obstructions cause excessive signal fading. Motorola offers a technology in our FTP
300, 500 and 600 products that can help. That is multiple transmitters and receivers that are timed and spaced apart and recoded back together offering significant fade reduction capabilities. What is this technology?
A. Dynamic Random Access Memory (DRAM)
B. Orthogonal Frequency Division Multiplexing (OFDM)
C. Multiple-Input and Multiple-Output (MiMO)
D. Dynamic Frequency Division Duplexing (DFDD)
正解:C
質問 2:A customer is connecting three local retail outlet sites to their main office. Retail Sites A and B will each need 10 Mbps connections. Site C will need a 25 Mbps connection. The customer requires a wireless backhaul solution in a RING configuration for redundancy.
What is the minimum capacity of each wireless link?
A. 90 Mbps
B. 25 Mbps
C. 45 Mbps
D. 20 Mbps
E. 10 Mbps
正解:C
質問 3:At what step of Motorola's seven step design process is a map of the coverage area initially required?
A. Detailed design
B. Requirement gathering
C. Choosing the appropriate product
D. Budgetary design
正解:B
質問 4:The reflection of a radio wave can affect the link quality:
A. negatively ONLY
B. it does not affect link quality
C. positively ONLY
D. either negatively or positively
正解:D
質問 5:Oceanside Information
The community of Oceanside is interested in obtaining a broadband access solution to all of the homes in the neighborhood. There is no fiber access in the neighborhood; however there is fiber near the entrance to the neighborhood on Highway A1A. The neighborhood association has requested that the proposal not have any tear-up of the existing roads.
The anticipated service area is approximately 1/2 x 1/3 miles.
Click on the Exhibit button to access the "Oceanside Map" and the "RFP Requirements"



The customer requirement calls for an over subscription rate of 20%, this supports which of the following statements?
A. Requires the use of 5.7/5.8 GHz for the links
B. Requires the designer to plan capacity at a higher throughput for the system
C. Allows the designer to plan capacity at a lower required throughput for the system
D. Allows the use of bi-polar antennas
正解:C
質問 6:Scenario

All of the following "Test/Acceptance Criteria" have been provided by the client, EXCEPT;
A. Region covered: Refer to specific locations on a map
B. Equipment that will be used for the test
C. Throughput requirements (Describe: TCP, UDP? Packet size?;
D. Application(s) that will be tested
E. Latency requirement if required
正解:E
質問 7:PMP 100 offers different levels of throughput to allow network operators more choices when planning for sector capacities. What are those levels?
A. 7 Mbps and 14 Mbps
B. 5 Mbps and 10 Mbps
C. 1 Mbps and 8 Mbps
D. 4 Mbps and 16 Mbps
正解:A
質問 8:The amount of MAC addresses to Ethernet Port mappings in a switch is finite. What happens when the available mappings in these lookup tables are exhausted?
A. The switch floods traffic for all MAC addresses that do not have a lookup entry out of all its ports
B. The switch sends a congestion notification out the port to throttle the traffic until the lookup tables have available entries
C. The switch caches all traffic destined for the MAC addresses that are not in the lookup tables until entries become available
D. The switch drops all traffic destined for MAC addresses that are not in the lookup tables
正解:A
質問 9:A business customer requires a PMP system to interconnect a number of buildings. The customer requires complete end-to-end security, however, the AP will be located at a location that does not provide physical security. What method can be used to ensure security for the system?
A. Install AES encryption on the PMP system
B. Enable VLAN's and set all data to be on a specific VLAN
C. Install a BAM (Bandwidth and Authentication Manager) server at one of the buildings and authenticate all SM's
D. Create VPN's with Authentication and Encryption between all building using 3rd party VPN capable routers or switches
正解:D
TopExamは君にMSC-111の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
一年間の無料更新サービスを提供します
君が弊社のMotorola Solutions MSC-111をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたMotorola Solutions MSC-111をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のMotorola Solutions MSC-111を持っていることを保証します。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のMSC-111問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
弊社は無料Motorola Solutions MSC-111サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料MSC-111サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのMSC-111問題集は自分に適するかどうか判断して購入を決めることができます。
MSC-111試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。
弊社は失敗したら全額で返金することを承諾します
我々は弊社のMSC-111問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のMotorola Solutions MSC-111を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
弊社のMotorola Solutions MSC-111を利用すれば試験に合格できます
弊社のMotorola Solutions MSC-111は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はMSC-111問題集の質問と答えが間違いないのを保証いたします。

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のMotorola Solutions MSC-111を利用すれば、君は一回で試験に合格できます。
Motorola Solutions Design Point (PTP and PMP) Solutions 認定 MSC-111 試験問題:
1. When deploying a FTP link, the use of high performance dish antennas is generally preferred when;
A) less interference mitigation is required.
B) more interference mitigation is required.
C) mounting on a rooftop.
D) a lighter antenna is required.
2. Motorola FTP products have the ability to increase capabilities and functions without changing hardware components, what is this ability known as?
A) Swap and Drop
B) Resilient Transistor technology
C) Software memory use scalability
D) Software based architecture
3. What is a relevant parameter to consider when creating a PMP coverage footprint map from a tower?
A) Wind loading on tower
B) Type of tower
C) Latitude of tower
D) Varying terrain around tower
4. Using Link Planner:

In this scenario we will be using Link Planner as one of the planning tools to prepare a proposal for a FTP link between two buildings. The first building will be identified as the
Maitland building and the second building will be identified as the Lake Mary building. A
LinkPlanner Exhibit is accessible by clicking the Exhibit button.
The wavy line along the X-axis of the LinkPlanner Exhibit indicates the terrain between these two example endpoints. This information was obtained from Motorola's FTP Path
Profiler Server by first entering which of the following into the Link Planner tool?
A) GPS coordinates
B) Street Addresses
C) Spectrum Analyzer results
D) Closest intersecting streets
5. For a PMP 5.7 FSK Advantage AP how far apart is the recommended center frequency spacing for an AP Cluster?
A) 14 MHz
B) 30 MHz
C) 20 MHz
D) 25 MHz
質問と回答:
質問 # 1 正解: B | 質問 # 2 正解: D | 質問 # 3 正解: D | 質問 # 4 正解: A | 質問 # 5 正解: D |