HACKER SAFEにより証明されたサイトは、99.9%以上のハッカー犯罪を防ぎます。
カート(0

ISQI CTAL-TM_Syll2012 問題集

CTAL-TM_Syll2012

試験コード:CTAL-TM_Syll2012

試験名称:ISTQB Certified Tester Advanced Level - Test Manager [Syllabus 2012]

最近更新時間:2025-06-12

問題と解答:全132問

CTAL-TM_Syll2012 無料でデモをダウンロード:

PDF版 Demo ソフト版 Demo オンライン版 Demo

追加した商品:"PDF版"
価格: ¥5999 

無料問題集CTAL-TM_Syll2012 資格取得

質問 1:
Test Management
Assume you are managing the system testing phase of a project.
The system test execution period is scheduled to twenty weeks.
All tests are manual tests. You are following a risk-driven test approach.
During the last staff meeting the project manager tells you new deadlines that will not allow completion of all the system tests.
Which of the following would you expect to be the best way to respond to this situation?
Number of correct responses: 1
K21 credit
A. Automate all remaining tests
B. No action is needed, test as much as possible in the remaining time period
C. Remove testers from your test team, so that they can be assigned to other projects
D. Prioritize executing the tests for the highest product risks and track these risks
正解:D

質問 2:
Test Management
You are the Test Manager of a new project that will have three formal levels of testing: unit, integration and system testing. The testing strategy you decide to adopt a blend of risk-based testing and reactive testing strategies.
Which of the following answers describes the most consistent example of implementation of this test strategy during the execution of the system tests?
Number of correct responses: 1
K21 credit
A. Your test team executes system tests under the guidance of a sample of users throughout the system test phase
B. Your test team executes scripted tests designed and implemented before the execution of the system test phase, to cover the identified product risks. It also performs exploratory testing sessions throughout the system test phase
C. Your test team autonomously performs some exploratory testing sessions and, at the very end of the system testing phase, it also executes more system tests under the guidance of a sample of users
D. Your test team executes exploratory tests following a session-based test management approach throughout the system test phase
正解:B

質問 3:
Test Management
You are the Test Manager of a new project aimed at developing a software system that must be certified at level B of the DO-178B standard. The project will follow a V-Model software development life cycle and it will have four formal levels of testing: component, integration, system and acceptance testing.
You must produce the test plan documentation for this project by providing an adequate coordination across the four levels of testing in order to assure auditability.
Which of the following answers would you expect to best describe how to organize the test plan?
Number of correct responses: 1
K32 credits
A. Produce a master test plan describing the relationship between the four levels, and four separate detailed level test plans, one for each level
B. Produce a single master test plan that covers in detail all four levels, describing the particular activities for all test levels
C. Produce a master test plan that covers three levels (component, integration, system test) and a separate acceptance test plan
D. Produce four separate detailed level test plans, one for each level, without a master test plan
正解:A

質問 4:
Defect Management
Which of the following information would you expect to be the most useful to perform a defect clustering analysis?
Number of correct responses: 1
K21 credit
A. The lifecycle phase in which the defect has been introduced
B. The defect removal efficiency information
C. The defect component information
D. The trend in the lag time from defect reporting to resolution
正解:C

質問 5:
Reviews
Consider the following list of statements about audits and management reviews:
I. Audits are usually more effective than management reviews at finding defects II. Audits and management reviews have the same main goals, the only difference is related to the roles and level of formality III. A typical outcome of an audit includes observations and recommendations, corrective actions and a pass/fail assessment IV. An audit is not the appropriate mechanism to use at the code review in order to detect defects prior to dynamic testing Which of the following statements is true?
Number of correct responses: 1
K21 credit
A. III. and IV. are true; I and II are false;
B. II. and III are true; I. and IV. are false;
C. I, III and IV are true; II. is false;
D. I. and III. are true; II. and IV. are false;
正解:A

質問 6:
Your application development team is performing "test-driven" development. This is a core principal of which software development model?[1]
A. Sequential
B. Agile
C. Spiral
D. Iterative
正解:B
解説: (Topexam メンバーにのみ表示されます)

質問 7:
The main objectives the senior management team wants to achieve are:
- to reduce the costs associated with dynamic testing
- to use reviews to ensure that the project is on course for success and following the plan
- to use reviews as a well-documented and effective bug-removal activity following a formal process with well-defined roles
- to determine the effectiveness of reviews in terms of phase containment
- to improve phase containment effectiveness
Which of the following answers would you expect to describe the best way to achieve these objectives?
Number of correct responses: 1
K43 credits
A. You should plan for formal exit-phase reviews at the end of each development and testing phase, and plan for a process of gathering information from testing to perform an analysis aimed at identifying the larger cluster of defects
B. You should plan for formal exit-phase reviews at the end of each development and testing phase, and plan for a process of gathering information from testing to perform an analysis of the bugs found during testing to determine the phase in which they have been introduced
C. You should plan for lightweight exit-phase reviews at the end of each development and testing phase, and plan for a process of gathering information from testing to perform an analysis aimed at identifying the larger cluster of defects
D. You should plan for formal exit-phase reviews at the end of each development phase and testing phase, and plan for a process of gathering information from testing to perform an analysis of the bugs found during testing to determine the people responsible for those bugs
正解:B

質問 8:
Test Management
The following chart plots the cumulative number of defects opened against the cumulative number of defects closed during system testing of a software product.

Which of the following statements is true?
Number of correct responses: 1
K21 credit
A. The chart seems to indicate that the defect management process is working well
B. The chart indicates that you have plenty of problems left to find
C. The chart can be used to reveal test progress problems
D. The chart seems to indicate that the defect management process is not working well
正解:A

質問 9:
Which of the following can demotivate a tester? [1]
A. Receiving direct and honest feedback on areas to improve
B. Working extra hours, resulting in a successful product deployment
C. When testing is cut short, resulting in a high number of production defects
D. When metrics indicate weaknesses in their testing
正解:C
解説: (Topexam メンバーにのみ表示されます)

ISQI CTAL-TM_Syll2012 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Includes people in roles such as testers test analysts test engineers
トピック 2
  • User acceptance testers and software developers
トピック 3
  • Advanced Level qualify cation is also appropriate for anyone who wants a deeper understanding of software testing.

参照:https://isqi.org/bd/istqb-certified-tester-advanced-level-test-manager#/26-language-german/28-exam-public_exam_session/32-time_extension-no/64-2try_exam-na

一年間の無料更新サービスを提供します

君が弊社のISQI CTAL-TM_Syll2012をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたISQI CTAL-TM_Syll2012をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のISQI CTAL-TM_Syll2012を持っていることを保証します。

弊社は無料ISQI CTAL-TM_Syll2012サンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料CTAL-TM_Syll2012サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのCTAL-TM_Syll2012問題集は自分に適するかどうか判断して購入を決めることができます。

CTAL-TM_Syll2012試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のCTAL-TM_Syll2012問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のISQI CTAL-TM_Syll2012を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

弊社のISQI CTAL-TM_Syll2012を利用すれば試験に合格できます

弊社のISQI CTAL-TM_Syll2012は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はCTAL-TM_Syll2012問題集の質問と答えが間違いないのを保証いたします。

CTAL-TM_Syll2012無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のISQI CTAL-TM_Syll2012を利用すれば、君は一回で試験に合格できます。

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のCTAL-TM_Syll2012問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

TopExamは君にCTAL-TM_Syll2012の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

CTAL-TM_Syll2012 関連試験
IREB-German - IREB Certified Professional for Requirements Engineering (IREB Deutsch Version)
CTFL-001 - ISTQB Certified Tester Foundation Level
CTFL_UK - ISTQB Certified Tester Foundation Level (Syllabus 2011, GB only)
CTAL-TA_Syll2012 - ISTQB Certified Tester Advanced Level - Test Analyst (Syllabus 2012)
CTAL-TTA-001-Deutsch - ISTQB Certified Tester Advanced Level - Technical Test Analyst (CTAL-TTA-001 Deutsch Version)
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。