無料問題集1z0-628 資格取得
質問 1:
Which two statements are correct regarding Daily Extracts in Oracle Field Service Cloud (OFSC)?
A. If using an overnight shift, the Daily Extracts for the previous day will be available only after the overnight period configured on the Business Rules screen has passed.
B. The Daily Extract files can be configured to include, exclude and/or arrange the order of corresponding fields and custom properties.
C. Daily Extracts can be configured to be available in either XML, CSV or HTML format.
D. When new custom properties are configured within OFSC, they are automatically added to the appropriate configured Daily Extract files.
E. Daily Extract files are accessible for download either via API, via SFTP or manually through the Outbound Integration Channels screenO OFSC.
正解:B,C
質問 2:
Your customer wants to configure an inner step message ("B") to send an email if a previous message ("A ) has Failed.
Which statement explains how this can be supported?
A. In the Message Scenario screen's Blocking Conditions tab of message B, add a condition that blocks the message when the message A's status is NOT IN failed.
B. In the Message Scenario screen's Blocking Conditions tab of message B, add a condition that blocks the message when the message A's status is NOT IN sent.
C. In the Message Scenario screen's Next Steps tab of message B, add message A as the Next Message Step with the final status Failed".
D. In the Message Scenario screen's Next Steps tab of message A, add message B as the Next Message Step with the final status "Failed".
正解:D
質問 3:
Your customer noticed a message that sometimes appears when they are moving activities between resources.
The message reads "Soft skill mismatch" and the customer wants it changed to read "Resource does not meet Preferable work skill level".
Which option fulfills that requirement?
A. From the Glossary, update the wording for the "Soft skill mismatch' entry within the "Activity Warning' category.
B. From the Glossary, update the wording for the "Soft skill mismatch' entry within the "Move Activity to Resource Alert' category.
C. From My Display, enable "Show Placeholder IDs', then turn the Glossary Editor on. When the original message appears when moving an activity, click the ID of the message and modify it to the new terminology.
D. From the Glossary, update the wording for the "Soft skill mismatch' entry within the "Move Activity Result' category.
正解:B
質問 4:
A utility company sees several 'New Connect' activities being added to the routing bucket throughout the day.
They want 'Meter Read' activities to potentially be removed from the technician's route so that the 'New Connect' activities can be assigned if the technician qualifies for the activity.
They enabled reoptimization in their routing plan and created a reoptimization filter targeting the 'Meter Read' activities.
What additional settings are required in the routing plan to meet the desired behavior?
A. Set the reoptimization goal to "Reduce Overdue". Then, using routing filters, set the cost of not assigning 'Meter Read activities in existing routes to 'High', and the cost of not assigning 'New Connect' activities in the routing bucket to 'Normal'.
B. Set the reoptimization goal to 'Assign high priority activities'. Then, using routing filters, set the cost of not assigning 'Meter Read activities in existing routes to 'High', and the cost of not assigning 'New Connect' activities in the routing bucket to 'Low'.
C. Set the reoptimization goal to 'Assign high priority activities'. Then, using routing filters, set the cost of not assigning 'Meter Read activities in existing routes to 'Low', and the cost of not assigning 'New Connect' activities in the routing bucket to 'High'.
D. Set the reoptimization goal to 'Assign high priority activities'. Then, using routing filters, set the cost of not assigning 'Meter Read activities in existing routes to 'Highest', and the cost of not assigning 'New Connect' activities in the routing bucket to 'Normal'.
正解:A
質問 5:
Which two are correct statements regarding Daily Extract file data configuration?
A. All data sets can be configured to include custom properties and fields.
B. Separate Daily Extract files must be set up for data to be used in BICS and DBaaS.
C. Customized data sets can be created for individual instances of OFSC.
D. Daily Extract files cannot be set up to extract data from multiple data sets
E. Data from a single data set can be configured to be extracted in any number of Daily Extract files
正解:A,E
解説: (Topexam メンバーにのみ表示されます)
質問 6:
Which two statements are true regarding the correlation between launch conditions and message scenarios within OFSC?
A. A given launch condition can be assigned to multiple message scenarios simultaneously.
B. A given message scenario can include multiple launch conditions simultaneously.
C. A given message scenario can only include one launch condition at a time.
D. A given launch condition can only be assigned to one message scenario at a time.
正解:B,D
解説: (Topexam メンバーにのみ表示されます)
質問 7:
Which statement is correct regarding the capabilities of 'reoptimization' within an Oracle Field Service Cloud (OFSC) routing plan?
A. In general, the higher the reoptimization penalty % is set, the less impact reoptimization will have on activities already assigned to routes.
B. 'Minimize summary travel1 is one of the selectable goals within the Reoptimization section of a routing plan.
C. Reoptimization can be enabled for manual, once-a-day, recurrent, immediate and sequential routing plans. ^j
D. Reoptimization filters are used to specify the costs of not assigning certain types of activities as well as lateness tolerances.
正解:C
質問 8:
Which two statements are true regarding filter functionality within OFSC?
A. Filters can be used in conjunction with activities, resources, and inventory.
B. Filters can be created where only certain User Types can see and interact with them.
C. If an activity filter has two conditions, then an activity must meet at least one of the conditions in order to be filtered.
D. After a filter has been created and saved, you cannot change the entity to which it is associated.
正解:B,C
解説: (Topexam メンバーにのみ表示されます)
質問 9:
What happens when you enable the assignment parameter "Limit work by points"?
A. Routing will use each activity's unique point value to prioritize assignment of higher point activities over lower point activities.
B. If a resource has a point value configured on their Resource Information screen, routing will limit assignment of additional activities if the cumulative point total exceeds the resource's point limit
C. Routing will not assign a given activity if that activity's point value exceeds the resource's maximum personal point limit.
D. If resources have shifts assigned to them with point values, routing will not assign activities whose cumulative point total exceeds the shift point value.
正解:B
解説: (Topexam メンバーにのみ表示されます)
一年間の無料更新サービスを提供します
君が弊社のOracle 1z0-628をご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたOracle 1z0-628をお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のOracle 1z0-628を持っていることを保証します。
弊社のOracle 1z0-628を利用すれば試験に合格できます
弊社のOracle 1z0-628は専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社は1z0-628問題集の質問と答えが間違いないのを保証いたします。

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のOracle 1z0-628を利用すれば、君は一回で試験に合格できます。
Oracle 1z0-628 認定試験の出題範囲:
トピック | 出題範囲 |
---|
トピック 1 | - Configure Activity And Route Alert Settings
- Configure New Resource Types, Resources, And Users
- Configure Resources For Routing
|
トピック 2 | - Describe How Daily Extracts Work And Can Be Used With Other Oracle Cloud Products
- Work Zone Configuration
|
トピック 3 | - Describe Collaboration Features And Usage
- Work Skills And Conditions
- Fields And Custom Properties
|
トピック 4 | - Describe Activity Types And Actions
- Describe The Concepts Of Work Skills And Work Skill Conditions
|
トピック 5 | - Configure Screen Text Using The OFSC Glossary
- Describe The Various Launch Conditions
- Describe The Concepts Of Work Zones
|
トピック 6 | - Describe Time Slots, Service Windows, Slas, And Delivery Windows
- Describe Resource Types And Roles
|
トピック 7 | - Configure A Work Skill And Associated Conditions
- Configure Quota Management For Buckets And Capacity Categories
|
トピック 8 | - Configure An Integration Between OFSC And Other Oracle Cloud Products
- Explain The Purpose, Structure, And Components Of The Resource Tree
|
トピック 9 | - Describe Inventory Types, And Inventory Consumption And Management
- Time Slots And Time Windows
|
トピック 10 | - Describe The Run Schedule, Assignment Parameters, And Filtering Options In Routing Plans
- Configure Business Rules Settings
|
トピック 11 | - Describe The Resource Calendar Options And Their Precedence
- Configure Company-Wide Calendar Settings
|
トピック 12 | - Configure Activity And Resource Travel Stats Fields
- Configure The Duration And Travel Time Parameters
|
トピック 13 | - Configure Screens For Core Manage And Mobility
- Describe The Four Types Of Custom Properties And Native System Fields
|
トピック 14 | - Configure General Manage And Mobility Display Settings
- Configure An Inventory Type And Individual Resource Inventory
|
参照:https://education.oracle.com/pls/web_prod-plq-dad/db_pages.getpage?page_id=5001&get_params=p_exam_id:1Z0-628
TopExamは君に1z0-628の問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。
弊社は失敗したら全額で返金することを承諾します
我々は弊社の1z0-628問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のOracle 1z0-628を利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。
安全的な支払方式を利用しています
Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社の1z0-628問題集は全部Credit Cardで支払われることができます。
領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。
弊社は無料Oracle 1z0-628サンプルを提供します
お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料1z0-628サンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこの1z0-628問題集は自分に適するかどうか判断して購入を決めることができます。
1z0-628試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。