質問 1:
Three testers joined the project team just before the end of the build. During the project team meeting, the testers indicated that the project quality is poor, and they should not continue testing until all the defects are fixed.
Which three actions should the project manager do? (Choose three.)
A. Stop the project and review the output.
B. Ask the sponsor for assistance and guidance.
C. Ask the testers to provide additional information.
D. Brainstorm the issue with the project team.
E. Continue with testing according to the plan.
正解:C,D,E

質問 2:
A project sponsor insists that the project scope for a new product launch should include two geographical locations. However, after the project scoping session was done, a project charter was completed and approved with one location only.
What should the project manager do?
A. Ask the sponsor to increase the budget and schedule of the project to accommodate the additional scope.
B. Assess the impact to the scope and submit a change request for approval of the two locations before including them in the scope of the project.
C. Encourage the sponsor to start another project for the additional location so that the current project is not impacted.
D. Discuss with the sponsor that the project scope is approved and it is not possible to include two locations as it will affect the budget.
正解:B

質問 3:
An organization is transitioning to agile. The project manager is discussing how to manage risks with the development team in light of the transition for a particular project. The team estimates the risk level as low.
What should the project manager do?
A. Capture all the backlog entries assessed by the development team to have evidence that risk management has been completed.
B. Create a risk register and include a single generic risk, set the level to low, and then close the risk at the end of the project.
C. Trust the development team's risk estimation and inform the project sponsor that the risks will be evaluated at a later time.
D. Create a risk register to identify, capture, review, and manage risks using a risk management process.
正解:D

質問 4:
A company's project management office (PMO) is incorporating more adaptive technologies and has hired a new project manager with hybrid project management experience. The team is slow in adopting the new methodology and has not been updating project artifacts in a timely manner.
Which action should the project manager take to improve the team's performance?
A. Send an email asking all project team members to complete updates at the end of the day.
B. Reach out to the functional managers for support.
C. Set up a training session for all project team members.
D. Speak individually with each project team member about making the needed updates.
正解:C

質問 5:
A facility extension project is in the execution stage. There is a project activity to connect the power of all new equipment to an existing facility, Point A, which requires a significant cable length. The construction team found that the power could be connected to Point B and save money.
What should the project manager do next?
A. Add the issue to the change log and request additional budget through the change control board (CCB).
B. Perform a cost-benefit analysis to evaluate using the Point B option.
C. Use the Point B option because it will save the project cost and time.
D. Seek a decision from the construction team after explaining the project budget and schedule constraint.
正解:B

質問 6:
During a meeting to define project scope a stakeholder tells the project manager that the main requested feature in the contract is not applicable, and this is documented in the lessons learned.
What should the project manager do?
A. Check that this information was documented correctly.
B. Meet with the sponsor to ask for their support.
C. Ask the sponsor to close the project and pay the contracted penalty.
D. Check with the team to learn what can be done, and consult an expert.
正解:A

安全的な支払方式を利用しています

Credit Cardは今まで全世界の一番安全の支払方式です。少数の手続きの費用かかる必要がありますとはいえ、保障があります。お客様の利益を保障するために、弊社のPMP問題集は全部Credit Cardで支払われることができます。

領収書について:社名入りの領収書が必要な場合、メールで社名に記入していただき送信してください。弊社はPDF版の領収書を提供いたします。

PMI PMP 認定試験の出題範囲:

トピック出題範囲
トピック 1
  • Business Environment: It covers aspects related to project compliance, benefits evaluation, and external business changes.
トピック 2
  • Process: This topic emphasizes project execution. It also discusses managing communications, assessing and managing risks, engaging stakeholders, planning and managing budget
  • resources, and planning and managing schedules.
トピック 3
  • People: This topic focuses on managing conflict, leading teams, supporting team performance, empowering team members and stakeholders. Furthermore, it focuses on ensuring adequate training, mentoring stakeholders, and defining team ground rules.

参照:https://www.pmi.org/certifications/project-management-pmp

TopExamは君にPMPの問題集を提供して、あなたの試験への復習にヘルプを提供して、君に難しい専門知識を楽に勉強させます。TopExamは君の試験への合格を期待しています。

一年間の無料更新サービスを提供します

君が弊社のPMI PMPをご購入になってから、我々の承諾する一年間の更新サービスが無料で得られています。弊社の専門家たちは毎日更新状態を検査していますから、この一年間、更新されたら、弊社は更新されたPMI PMPをお客様のメールアドレスにお送りいたします。だから、お客様はいつもタイムリーに更新の通知を受けることができます。我々は購入した一年間でお客様がずっと最新版のPMI PMPを持っていることを保証します。

弊社は無料PMI PMPサンプルを提供します

お客様は問題集を購入する時、問題集の質量を心配するかもしれませんが、我々はこのことを解決するために、お客様に無料PMPサンプルを提供いたします。そうすると、お客様は購入する前にサンプルをダウンロードしてやってみることができます。君はこのPMP問題集は自分に適するかどうか判断して購入を決めることができます。

PMP試験ツール:あなたの訓練に便利をもたらすために、あなたは自分のペースによって複数のパソコンで設置できます。

弊社のPMI PMPを利用すれば試験に合格できます

弊社のPMI PMPは専門家たちが長年の経験を通して最新のシラバスに従って研究し出した勉強資料です。弊社はPMP問題集の質問と答えが間違いないのを保証いたします。

PMP無料ダウンロード

この問題集は過去のデータから分析して作成されて、カバー率が高くて、受験者としてのあなたを助けて時間とお金を節約して試験に合格する通過率を高めます。我々の問題集は的中率が高くて、100%の合格率を保証します。我々の高質量のPMI PMPを利用すれば、君は一回で試験に合格できます。

弊社は失敗したら全額で返金することを承諾します

我々は弊社のPMP問題集に自信を持っていますから、試験に失敗したら返金する承諾をします。我々のPMI PMPを利用して君は試験に合格できると信じています。もし試験に失敗したら、我々は君の支払ったお金を君に全額で返して、君の試験の失敗する経済損失を減少します。

PMP 関連試験
PMI-CP-KR - PMI Construction Professional in Built Environment Projects (PMI-CP) (PMI-CP Korean Version)
PMP-JPN - Project Management Professional (PMP日本語版)
PMP-KR - Project Management Professional (PMP Korean Version)
PMI-RMP - PMI Risk Management Professional
PMP-Deutsch - Project Management Professional (PMP Deutsch Version)
連絡方法  
 [email protected] サポート

試用版をダウンロード

人気のベンダー
Apple
Avaya
CIW
FileMaker
Lotus
Lpi
OMG
SNIA
Symantec
XML Master
Zend-Technologies
The Open Group
H3C
3COM
ACI
すべてのベンダー
TopExam問題集を選ぶ理由は何でしょうか?
 品質保証TopExamは我々の専門家たちの努力によって、過去の試験のデータが分析されて、数年以来の研究を通して開発されて、多年の研究への整理で、的中率が高くて99%の通過率を保証することができます。
 一年間の無料アップデートTopExamは弊社の商品をご購入になったお客様に一年間の無料更新サービスを提供することができ、行き届いたアフターサービスを提供します。弊社は毎日更新の情況を検査していて、もし商品が更新されたら、お客様に最新版をお送りいたします。お客様はその一年でずっと最新版を持っているのを保証します。
 全額返金弊社の商品に自信を持っているから、失敗したら全額で返金することを保証します。弊社の商品でお客様は試験に合格できると信じていますとはいえ、不幸で試験に失敗する場合には、弊社はお客様の支払ったお金を全額で返金するのを承諾します。(全額返金)
 ご購入の前の試用TopExamは無料なサンプルを提供します。弊社の商品に疑問を持っているなら、無料サンプルを体験することができます。このサンプルの利用を通して、お客様は弊社の商品に自信を持って、安心で試験を準備することができます。